What's your reaction?
0Cool0Bad0Lol0SadYou May Also Like
With the U/W construction 23 boat ramps under our belts we are able to provide efficient ways of completing the underwater phase of construction which is often tricky and slow if approached the wrong way.
Piles and structures are cleaned with either HP water jetting, hydraulic barnacle buster or hand tools to allow inspection and maintenance to be undertaken. We are familiar with WSCAM inspection requirement and Transport and Main Roads, Structures Inspection criteria.
Moorings need to be designed to calculate in the length of the vessel, weight, configuration and mooring location together with bottom composition, current, water depth, expected wind, waves, currents and regulations for the area. Moorings vary from concrete blocks to anchor configurations, enviro screw anchors etc. We can advise on the one that best suits your requirement and give you a quote.